Newcrest_Mining_logo

LOCATION

East Pilbara, WA

Duration

2021 - current

Commodity

Gold

Jetcrete operates at the newly established Havieron project within the Newcrest-Greatland JV located in the East Pilbara region of Western Australia, 40km from Telfer.

Jetcrete currently operates a fully owned state of the art fully automated batch plant.

Since the start of the project, Jetcrete has built the maintenance workshop, infrastructure for the batch plant and concrete works for the vent shaft and wash bay are currently underway.

Jetcrete_icons_thin_Concrete_manufacture_stats

0m3

fibrecrete / concrete manufactured p/a
Jetcrete_icons_thin_Personnel_stats

0

operations personnel

SERVICES

Concrete manufacturing

Jetcrete_icons_Services_Batch_small

Delivery

Agitator

Remote shaft lining

Jetcrete_icons_Services_Applications_small

Laser scanning

Jetcrete_icons_Services_Laser_Scanning_small

Resin injection

Jetcrete_icons_Services_Resin_Injection_small

Civil construction

Jetcrete_icons_Services_Civil_Construction

0  fleets

on operation
Jetcrete_icons_thin_Fleet_Agitator_stats

0

Agitators
Jetcrete_icons_thin_Fleet_Spraymec_stats

0

Spraymec
Jetcrete_icons_thin_Fleet_Light_Vehicles_stats1

0

Light Vehicle
Jetcrete_icons_thin_Fleet_IT_Loader

0

IT Loader
  • 0%
  • 0%
  • 0%
  • 0%